Capita Spring – Steel Connection Design
The project is a 280-metre integrated development comprising of Grade A office, serviced apartments and social activity spaces spread over different storeys.
WYN was engaged by main contractor; Dragages Singapore Pte Ltd to redesigning Level 21 from in-situ concrete structures to steel structures, due to constructability issues as a result of trip volume underneath Level 21 against the original concrete floors.
WYN also provided design of other steelworks of the building such as equipment and façade support. The key challenge is to carry out the design under many site constraints. With careful planning and coordination with different stakeholders. WYN delivered practical and efficient solutions to address the constructability issues and met the project timeline.