BCA Academy – Steel Connection Design

The new BCA Academy project site is situated at Braddell road where it has a 25,000 meter square building consists of a 7-storey Zero Energy Building (ZEB) and a 16-Storey Super Low Energy Building (SLEB). WYN was tasked to provide facade and barrier supports, as well as maintenance and removable water tank platforms, suiting the various needs of the building.

A refreshing challenge we encountered was designing connections interfacing between steel-timber structures. This project provided a stepping stone in encouraging us to look beyond the use of conventional steel and concrete materials for our buildings and striving towards a more sustainable built environment.